{"id":4862,"date":"2021-08-12T11:30:52","date_gmt":"2021-08-12T10:30:52","guid":{"rendered":"http:\/\/www.akbn.gov.al\/?p=4862"},"modified":"2021-08-12T11:30:52","modified_gmt":"2021-08-12T10:30:52","slug":"services-provided-by-mining-directorate","status":"publish","type":"post","link":"https:\/\/akbn.bota.business\/en\/services-provided-by-mining-directorate\/","title":{"rendered":"Services provided by Mining Directorate"},"content":{"rendered":"<p>Technical-economic studies and opening and exploitation projects (to obtain a Mining Permit on Exploitation);<\/p>\n<p>Environmental impact assessments;<\/p>\n<p>Geological-engineering reports and projects on utilization of river aggregates;<\/p>\n<p>The technical project on mines, on horizontal, vertical capital works (wells), dysentery, etc., of various lengths;<\/p>\n<p>Technological projects on mines construction, concerning horizontal, sloping, vertical works;<\/p>\n<p>General ventilation projects of mine;<\/p>\n<p>Local ventilation projects;<\/p>\n<p>Mining transport projects;<\/p>\n<p>Compressed air supply projects;<\/p>\n<p>Water drainage projects;<\/p>\n<p>Exploitation system projects;<\/p>\n<p>Technical projects on surface facilities of mines;<\/p>\n<p>Technological studies on ore dressing;<\/p>\n<p>Technological projects on ore dressing;<\/p>\n<p>Implementation projects on dressing plants, for various ores;<\/p>\n<p>Dam projects, for various ores;<\/p>\n<p>Surveys in different degrees;<\/p>\n<p>Updates in different degrees;<\/p>\n<p>Location of facilities, civil and industrial ones;<\/p>\n<p>Leveling of facilities, civil and industrial ones;<\/p>\n<p>Profiles of high and low voltage power lines;<\/p>\n<p>Water supply profiles;<\/p>\n<p>Road projects and profiles;<\/p>\n<p>Assessing stock volume.<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Technical-economic studies and opening and exploitation projects (to obtain a Mining Permit on Exploitation); Environmental impact assessments; Geological-engineering reports and projects on utilization of river aggregates; The technical project on mines, on horizontal, vertical capital works (wells), dysentery, etc., of various lengths; Technological projects on mines construction, concerning horizontal, sloping, vertical works; General ventilation projects [&hellip;]<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[102],"tags":[],"class_list":["post-4862","post","type-post","status-publish","format-standard","hentry","category-minierat-sidebar-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/akbn.bota.business\/en\/wp-json\/wp\/v2\/posts\/4862","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/akbn.bota.business\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/akbn.bota.business\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/akbn.bota.business\/en\/wp-json\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/akbn.bota.business\/en\/wp-json\/wp\/v2\/comments?post=4862"}],"version-history":[{"count":1,"href":"https:\/\/akbn.bota.business\/en\/wp-json\/wp\/v2\/posts\/4862\/revisions"}],"predecessor-version":[{"id":4863,"href":"https:\/\/akbn.bota.business\/en\/wp-json\/wp\/v2\/posts\/4862\/revisions\/4863"}],"wp:attachment":[{"href":"https:\/\/akbn.bota.business\/en\/wp-json\/wp\/v2\/media?parent=4862"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/akbn.bota.business\/en\/wp-json\/wp\/v2\/categories?post=4862"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/akbn.bota.business\/en\/wp-json\/wp\/v2\/tags?post=4862"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}